The Value Methodology, the oldest, most complete process for identifying problems or improvement opportunities in products, processes or services, has not been adopted nor does it enjoy the visibility of the more popular management tools in today's competitive environment. Total Quality Management, Theory of Constraints, Quality Function Deployment, Design of Experiments, Design for Manufacturing/Assembly, TRIZ, Target Costing, Lean Manufacturing, Six Sigma, etc., are a few of the tools being employed by organizations to resolve problems and improve their bottom line. While these tools may work well within their focus, many lack the broad scope necessary to resolve the overall business concern.
This paper will provide a brief survey of these tools and how they relate to the Value Methodology Job Plan. In many instances the most beneficial management approach would be to employ the value methodology as an overarching approach to addressing management concerns and inserting the appropriate tool when conditions warrant.
The Let’s Get Windsor-Essex Moving strategy is a commitment by the federal and provincial governments to jointly invest $300 million for the implementation of short- and medium-term projects to improve traffic flows to existing crossings and address congestion and security issues in the Windsor Gateway. The strategy includes grade separation of the cross-border Canadian Pacific Railway line at Howard Avenue and Walker Road. The projects are being delivered by the Ontario Ministry of Transportation in cooperation with the City of Windsor and Transport Canada.
Howard Avenue is a major north-south arterial road in Windsor. Significant traffic delays are experienced from the 26 trains that cross Howard Avenue at the CPR tracks each day and these delays have become longer following the installation of the Vehicle and Cargo Inspection System (VACIS), which is required by the U.S. Customs and Border Protection Agency for US-bound trains.
The project to construct a grade separation at Howard Avenue received environmental assessment approval in Spring 2007 and is currently in design with an anticipated construction start in 2009.
A value engineering study was held early in the design phase of the project to identify opportunities to increase the value of the project based on an analysis of the EA recommendations and early pre-design work. The VE brought together all the key stakeholders in the project including representatives from Canadian Pacific Railway, Hydro One Networks, City of Windsor and Transport Canada. Key members of the newly acquired design consultant also participated to maximize the flow of ideas from the workshop to the design team.
The VE study resulted in significant improvements to the design including new bridge types for the two structures and alignment revisions. Value is being realized by the implementation of recommendations that improve the design and reduce property impacts.
À Sanmina-SCI, nous avons utilisé la technique de VAVE sur plusieurs produits des secteurs industriel et des télécom, tels que routeur et commutateur internet, le sans-fil RFID (identification par fréquence radio) et les contrôleurs industriels. Durant les derniers 10 ans, nous avons réalisé plusieurs sessions jointes de VAVE avec nos clients principaux, qui ont généré des dizaines de millions de dollars en réduction de coûts, amélioration de la qualité et réduction du gaspillage. Nous allons maintenant présenter notre approche et quelques études cas récentes.
Depuis l'année 2001, conjointement avec un client majeur, nous avons développé une approche accélérée pour conduire des sessions de VAVE, ce qui était nécessaire pour respecter les délais. Nous pouvons compléter une session de VAVE sur un assemblage complexe de PCBA (Printed Circuit Board Assembly ou Circuit Imprimé Assemblé) ou d'un chassis dans une journée. Pour y arriver, nous préparons et distribuons toute l'information requise deux jours avant la session en plénière. Trois phases sont compétées durant la session d'un jour: Analyse fonctionnelle et des coûts, créativité et évaluation des idées. Finalement, les phases de développement et présentation, suivies de l'implantation et du suivi, sont faites dans les semaines suivantes par des appels conférences hedomadaires.
John Counter Boulevard is a 3.6 km section of roadway that runs east-west within the City of Kingston. It accommodates large volumes of traffic serving local and regional traffic demand. The roadway has become a critical arterial providing an east-west transportation corridor midway between Highway 401 and downtown Kingston. This route will make up part of the corridor for a future third crossing of the Cataraqui River.
To address existing and future demand, the City is proceeding with plans to widen the arterial from 2 to 4 lanes. The Project offers considerable challenges including a proposed grade separation (road over rail) to be constructed in poor soils and through a wetland, contaminated soils issues, property and funding constraints. The estimated cost included in the ESR for the improvements was $32M (2003 Dollars). The City proposes to fund the project entirely through development charges.
MRC undertook a Risk Management Workshop and Risk Analysis in the early stages of their Preliminary and Detailed Design Assignment prior to the final selection of the grade separation alignment. Although not normally undertaken as part of a Risk Assessment Workshop, a brief Value Engineering brainstorming session was integrated with contributions from all of the Workshop participants. This presentation, a case study of MRC’s RECAP Risk Management Process, will include remarks on the integration of some Value Engineering in the Risk Management Process as well as some comments on the suitability to Municipal Government Transportation Projects.
Function cost is a tool used in value studies to help illustrate the relationships between project elements. Interactions between elements and their perceived value are examined and then used to provide insight into cost.
Through a function cost analysis each project component (function) is identified and assigned an estimated cost. Then, these figures are compared to their perceived value. The exercise yields determinations about value mismatches, shedding light on problem areas. The primary objective of this concept is to achieve the highest user satisfaction while decreasing function costs. This powerful tool is the keystone of effective value planning.
The concept of function cost is widely recognized in theory, but lacks an abundance of documented practical examples. In this presentation, five case studies are drawn from various infrastructure design projects. A series of function cost analyses were incorporated in these projects during the planning phase, and invaluable insight was realized as a result.
The following case studies were conducted:
Case Study 1 - Value is achieved through function cost increases.
Case Study 2 - Value is achieved though reducing cost via selection of an alternate.
Case Study 3 - Value is increased through comprehensive understanding of function cost through the eyes of the client.
Case Study 4 - The perception of cost allocation is explored, with reallocation of the proper function cost elements.
Case Study 5 - Simple solution leads to decreased cost and increased value.
This presentation will walk attendees through the processes of an actual function cost exercise. The information shared here will provide an understanding of how the delicate balance between cost and user satisfaction can be managed. A variety of graphical exhibits will be presented that help explain the importance of this tool and its impact on the engineering industry.
HDR has successfully combined Cost Risk Analysis with Value Engineering into an integrated process called “CRAVE”. CRAVE identifies and quantifies opportunities while accounting for risk. CRAVE augments risk analysis by assessing within the same framework all possible alternatives and solutions suggested or recommended by the value engineering team, providing a reality check on proposed innovations. The presentation will provide an overview of the process and how it's applied to various type of projects as well as discuss few case studies.
VE Can Help Teams and Projects Be More Sustainable: