Project Cost | Highway 7’s new alignment from Kitchener to Guelph including directional interchange at the highway 7 and Kitchener Waterloo Expressway and six other interchanges, 3 major water crossings including Grand River. |
VE Goals | Validate/Improve Design, Improve Constructability, Improve Safety, Risk Analysis |
VE Benefits | $22 million in savings. Improved mainline operations. Aesthetic improvements to the Grand River Structure. |