You selected a member publication.
Please login to access member
publications.
Not a member? Find out more
about the
benefits of joining.
Manufacturing
Author : Andrea DeMori
Description :
Presentation outlines VA and project planning techniques used by a large mining and metallurgical company. Demonstrates how VA helped the company set goals within a decision triangle, to define a scope to fit a set budget within performance and schedule.
Format : N/A
Year : 2007
Login to download
Author : Angelo Segall, CMC Electronics
Description :
Format : N/A
Year : 2007
Login to download
Author : Pierre Marquis, Sanmina SCI
Description :
Format : N/A
Year : 2007
Login to download
Author : Simon Ouellet, McGill University
Description :
Format : N/A
Year : 2007
Login to download
Author : Frederick Gagnon, Eric Breton, H.Fontaine
Description :
Format : N/A
Year : 2007
Login to download
Author : Andrea DeMori, Hatch
Description :
Format : N/A
Year : 2007
Login to download
Author : Robert Gagné, Knowllence America
Description :
Format : N/A
Year : 2007
Login to download
Author : Ziad Eldada, Creative Value Engineering
Description :Time to Cost Engineering is a value process, applicable to New Products Development or Existing Products Enhancement, it insure the product introduction into market, at the required cost and the required time, satisfying the true requirements of both: end users and product owners. The process deals with costs, needs and values, complemented by a suite of software tools conceived to automate all manual operations, and demonstrate parameters and results analytically and graphically.
Format : N/A
Year : 2007
Login to download
Author : Mike de Lillo - Thomas & Betts
Description :Thomas & Betts uses value engineering to develop its products in an efficient way, part of an integrated product development process
Format : N/A
Year : 2007
Login to download
Author : G. Issid - QIT
Description :QIT uses value engineering to improve its projects and get its money’s worth.
Format : N/A
Year : 2007
Login to download