By the end of 2012, approximately 150 Value Analysis studies resulted in over $1 billion in cost savings/cost avoidance for MTO.
A description of the Value Engineering/ Value Analysis process and information about the $800 Million in cost savings, cost avoidance that the Ontario Ministry of Transportation has had with VE.
A description of the Value Engineering/ Value Analysis process and information about the $800 Million in cost savings, cost avoidance that the Ontario Ministry of Transportation has had with VE.